Skip to content

Merge pull request #25 from conestack/refactor-package-layout #25

Merge pull request #25 from conestack/refactor-package-layout

Merge pull request #25 from conestack/refactor-package-layout #25

Triggered via push December 1, 2025 09:12
Status Failure
Total duration 21s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

8 errors
test (3.11)
Process completed with exit code 2.
test (3.12)
Process completed with exit code 2.
test (3.13)
The strategy configuration was canceled because "test._3_12" failed
test (3.13)
Process completed with exit code 2.
test (3.10)
The strategy configuration was canceled because "test._3_12" failed
test (3.10)
Process completed with exit code 2.
test (3.14)
The strategy configuration was canceled because "test._3_12" failed
test (3.14)
The operation was canceled.