-
Notifications
You must be signed in to change notification settings - Fork 1
Expand file tree
/
Copy pathREADME
More file actions
26 lines (20 loc) · 1.1 KB
/
README
File metadata and controls
26 lines (20 loc) · 1.1 KB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Synthetic South Carolina 500-bus power system model.
This is an entirely synthetic 500 bus case, geographically situated
in the northwestern part of the US state of South Carolina. The case is
designed with a 345 and 138 kV transmission network to serve
a load that roughly mimics the actual population of its geographic
footprint. The synthetic transmission system was designed by
algorithms described in [1] to be statistically similar to actual
transmission system models but without modeling any actual lines.
When publishing results based on this data, please cite:
[1] A.B. Birchfield, T. Xu, K.M. Gegner, K.S. Shetye, T.J. Overbye,
"Grid Structural Characteristics as Validation Criteria for
Synthetic Networks," IEEE Transactions on Power Systems,
vol. 32, no. 4, pp. 3258-3265, July 2017.
doi: 10.1109/TPWRS.2016.2616385
This is a synthetic power system model that does not represent the
actual grid. It was developed as part of the US ARPA-E GRID DATA
research project and contains no CEII.
One-line diagrams and other data formats available at:
https://electricgrids.engr.tamu.edu
May 16, 2017